• UTRC II SUBMISSION SYSTEM
  • Careers
  • Contact
  • Login / Register

Search form

Home
  • Home
  • About
    • Welcome to the UTRC Site
    • Theme
    • Staff
    • Board of Directors
    • Press
    • Annual Report
    • Program Progress Performance Report
    • Newsletter
  • Research
    • Projects
    • RFPs
    • Submit Your Proposal
    • Funding Categories
      • UTRC Research Initiative
      • UTRC Advanced Technology Initiative
      • UTRC Faculty Development Mini-grants
      • UTRC Best Transportation Paper Competition
      • News
  • Publications
  • Directory
    • Consortium Universities
    • Partners
    • Principal Investigators
    • Staff
    • Board of Directors
  • Education
    • Where to Study
    • Transportation and Planning Doctoral Series
    • AITE Scholarships
    • UTRC Dissertation Grants
    • Summer Institute
    • September 11th Memorial Program
    • Technology Transfer and Training
    • Online Graduate Certificate Program
    • UTRC Travel Grants
    • Student Award Recipients
    • Apply For Scholarships
  • Events
    • Upcoming Events
    • Past Events
    • Visiting Scholar Seminar Series
  • Resources
A | B | C | D | E | F | G | H | I | L | M | N | O | P | Q | R | S | T | U | V | W

Show All

Barricade Lighting System
Project Status:
Complete
Project Dates:
12/31/2009 to 03/31/2011
Author(s):
Dr. Mark Rea, Dr. John Bullough
Sponsor(s):
Research and Innovative Technology Administration / USDOT (RITA)
Barriers to Regional Cooperation in Public Transportation in the New York-New Jersey Region
Project Status:
Complete
Project Dates:
01/01/1989 to 12/31/1991
Author(s):
Sponsor(s):
Research and Innovative Technology Administration / USDOT (RITA)
Benefits Package Value
Project Status:
Complete
Project Dates:
03/01/2002 to 06/01/2002
Author(s):
Dr. Frederick Brodzinski, Dr. Camille Kamga, Robert F. Baker, Dr. Jochen Albrecht
Sponsor(s):
Research and Innovative Technology Administration / USDOT (RITA), New York State Department of Transportation (NYSDOT)
Blacktop Resurfacing of Bridge Decks
Project Status:
Complete
Project Dates:
10/01/1997 to 04/30/1999
Author(s):
Dr. Nenad Gucunski
Sponsor(s):
Research and Innovative Technology Administration / USDOT (RITA), New Jersey Department of Transportation (NJDOT)
Bridge Appurtenances
Project Status:
Complete
Project Dates:
01/01/2002 to 12/31/2002
Author(s):
Dr. Neville A. Parker
Sponsor(s):
Research and Innovative Technology Administration / USDOT (RITA), New Jersey Department of Transportation (NJDOT)
Bridge-Vehicle Impact Assessment
Project Status:
Complete
Project Dates:
04/01/2008 to 12/31/2011
Author(s):
Dr. Anil Agrawal, Dr. Cynthia Chen
Sponsor(s):
New York State Department of Transportation (NYSDOT), Research and Innovative Technology Administration / USDOT (RITA)
Bronx Travel and Accessibility Studies
Project Status:
Complete
Project Dates:
01/01/1996 to 12/31/2001
Author(s):
Dr. Robert E. Paaswell, Dr. Joseph Berechman
Sponsor(s):
Research and Innovative Technology Administration / USDOT (RITA)
Bus Rapid Transit on New York City Streets
Project Status:
Complete
Project Dates:
01/01/2003 to 12/31/2004
Author(s):
Dr. Robert E. Paaswell, Herbert Levinson (Late), Dr. Todd M. Goldman
Sponsor(s):
J.M. Kaplan Fund (JMK Fund)
Barriers to Resource Coordination for Multi-Modal Evacuation Planning
Project Status:
Complete
Project Dates:
11/01/2011 to 04/30/2013
Author(s):
Dr. Daniel B. Hess
Sponsor(s):
Research and Innovative Technology Administration / USDOT (RITA)
Benchmarking for Asset Hierarchy, Criticality Assessment and Risk Analysis at the MTA and other Transportation Companies
Project Status:
Complete
Project Dates:
04/09/2013 to 07/01/2013
Author(s):
Dr. Mohsen A. Jafari
Sponsor(s):
Metropolitan Transportation Authority (MTA)
Broadband Hybrid Electromagnetic and Piezoelectric Energy Harvesting from Ambient Vibrations and Pneumatic Vortices Induced by Running Subway Trains
Project Status:
Complete
Project Dates:
01/01/2014 to 12/31/2014
Author(s):
Ya Wang
Sponsor(s):
University Transportation Research Center (UTRC)
Building a Sense of Place in an Information Era: Accessibility, Connectivity and Travel
Project Status:
Complete
Project Dates:
06/01/2015 to 03/31/2017
Author(s):
Roger Chen
Sponsor(s):
University Transportation Research Center (UTRC)
Biological Control of Invasive Pale and Black Swallow-Worts in New York State - Field Evaluation of Hypena opulenta
Project Status:
Active
Project Dates:
11/05/2018 to 10/31/2021
Author(s):
Dylan Parry, Carrie Brown-Lima, Dr. Andrea Davalos, Dr. Jaclyn Schnurr
Sponsor(s):
New York State Department of Transportation (NYSDOT)
Best Practices for the Reduction, Reuse, and Recycling of Vehicle Wash Water
Project Status:
Active
Project Dates:
08/23/2018 to 08/22/2020
Author(s):
Dr. Xinwei Mao
Sponsor(s):
New York State Department of Transportation (NYSDOT)
Business Location Data Analysis and Editing Interface Tool Development
Project Status:
Complete
Project Dates:
09/13/2019 to 09/30/2021
Author(s):
Dr. Camille Kamga, Sandeep Mudigonda
Sponsor(s):
New York State Department of Transportation (NYSDOT)

Show All

Search

Search form

Join the UTRC Community

Click here to sign up.

Publications

Design of a Scale Model to Evaluate the Dispersion of Biological and Chemical Agents in a NYC Subway Station
Development of a Rational Method to Design Wick Drain Systems
Diesel Retrofit Assessment for NYS DOT to Retrofit its Existing Engine Fleet
See All Publications
Please subscribe to our Newsletter:

Get our newsletter

Please enter your email address to subscribe to our newsletter:

Contact Us

University Transportation Research Center
Marshak Hall - Science Building, Suite 910 
The City College of New York
138th Street & Convent Avenue ,New York, NY 10031